Mishkeegogamang First Nation invites qualified firms to submit proposals for Engineering Services as detailed in the “TERMS OF REFERENCE FOR DESIGN ENGINEERING SERVICES FOR THE NEW OSNABURGH WATER TREATMENT SYSTEM UPGRADES PROJECT FOR MISHKEEGOGAMANG FIRST NATION”.
The project will consist of the completion of the planning, design, construction, commissioning, performance trial, warranty, and long-term follow-up support of the Mishkeegogmang Water Treatment Systems Upgrades Project at the New Osnaburgh settlement. The project includes but is not limited to the design, construction, commissioning, performance trial, warranty, and support services of the planned expansion of the existing water treatment facility, its raw water pumping system, its treated water storage reservoir, its building, its pre-filtration and primary membrane treatment technology, new water servicing connections to the existing piped distribution network for 43 infill lots throughout the settlement proper, wastewater piping connections to the existing system, and decommissioning of the existing water treatment plant.
Full details are provided in the Terms of Reference (TOR) Document.
One PDF copy of your proposal must be email-delivered to the following address on or before 14:00 hours, Winnipeg time, Friday May 6, 2022.
Mishkeegogamang First Nation Water Treatment System Upgrades Project Team
Proposal Call for Design Engineering Services
c/o ODK Engineering.
135 - 200 Alpine Way
Swan Lake First Nation 8A, Headingley MB R4H 0B7
Attention: Randi Thomas, PMP, rthomas@odkengineering.com
The last day for questions is April 27, 2022 @ 17:00.
Late or misdirected proposals will not be accepted.
Any questions regarding the contents of the TOR documents shall be directed to Randi Thomas, M.Env., PMP, rthomas@odkengineering.com.