D2.1 The Work to be done under the Contract shall consist of the replacement of the roof sections
A1, B1 and C1 of WFPS Station # 25 located at 701 Day St.
D2.2 The major components of the Work are as follows:
(a) Furnish all labor, materials, tools and equipment necessary for the removal and disposal of
existing low-slope roof (BUR) & low slope EDPM systems (Roof-A1, B1), including removal
of non-operational roof curbing, flashings, etc, and the design and installation of a
complete low-slope roof system capped with a fully adhered TPO single-ply system.
(Firestone Ultraply TPO fully-adhered. 60-mil (1.52mm)) Including the accessory items
such as new drains, (ensure slope to positive drainage) connections, scuppers, drain
inserts, copings, flashings, re-paint gas-lines, rubber blocks c/w roof membrane protection
traffic cap, pitch boxes penetration seals c/w liquid sealant, at a minimum.
(b) Furnish all labor, materials, tools and equipment necessary for the removal and disposal of
existing steep-slope systems (Roof- C1), including removal of non-operational roof curbing,
flashings, etc, and the design and installation of a complete step-slope roof system.
Including the accessory items such as new drains, (ensure slope to positive drainage)
connections, scuppers, drain inserts, copings, flashings, pitch boxes penetration seals c/w
liquid sealant, at a minimum.