B3. SITE INVESTIGATION
B3.1 Further to C3.1, the Proponent shall attend a Site meeting at Millennium Library, 251 Donald Street at 2:00 PM to 3:00 PM on March 11, 2024 or 11:00 AM to 12:00 PM on March 12, 2024. Attendance is mandatory, and the Proposal of any Proponent not having attended will be rejected on the basis that it is non-responsive.
B3.2 The Proponent shall not be entitled to rely on any information or interpretation received at the Site Meeting unless that information or interpretation is the Proponent’s direct observation, or is provided by the Contract Administrator in writing.
B3.3 The Proponent is responsible for inspecting the Site, the nature of the Work to be done and all conditions that might affect their Proposal or their performance of the Work, and shall assume all risk for conditions existing or arising in the course of the Work which have been or could have been determined through such inspection.
B3.4 The Proponent is responsible for determining:
(a) all matters concerning access to the Site, power supplies, location of existing services, utilities or materials necessary for the completion of the Work; and
(b) all other matters which could in any way affect their Proposal or the performance of the Work.