This project consists of interior renovations to create new biology laboratory and office spaces within existing lab suites, including hazardous material abatement, and a new mechanical roof top unit.
The work includes an interior renovation of approximately 5,150 ft² on the third floor of Biology 1 and ground floor of Biology 2 buildings.
The Work is identified as B1 B2 Lab Alterations, also
known as WR#41941, as prepared by the Consultant, McCallum Sather Architects Inc.
General Contractors are invited to bid provided they demonstrate that they
are currently on a Vendor of Record list for any Post-secondary Education
Institution or Publicly Funded School Board for projects over $2.5M in
construction value (excl HST). Scope of work includes renovations within an
occupied building with Type III Asbestos Abatement requiring detailed
phasing and hoarding plans to be prepared by the Contractor. General
contractors to provide a completed CCDC 11 –2016 form listing a minimum
of three projects with similar complexity and scope. Bidders shall provide a
WSIB CAD 7 certificate indicating injury statistics for the last 5 years.
References and Health and Safety Program details will be requested from
the shortlisted bidders.
Questions should be directed to the consultant, McCallum Sather Architects at
liamb@mccallumsather.com