GENERAL SCOPE OF WORK
Supply, delivery and support of temperature data loggers for cast-in-place concrete wherein the cast-in-place device is without internal power supply and non-transmitting when detached from the monitoring and transmitting equipment. This will be confirmed by pre-award security verification as outlined in Part A – Instructions to Bidders, Article 50.3. Devices that do not pass pre-award security verification will not be considered.
Devices to comply with temperature monitoring requirements outlined in each thermal plan (see attached reference document in Part C – Tender Package Documents), as well as transmitting and reporting requirements as outlined in the contract documents and all applicable codes, standards, and regulations. Including, but may not be limited to the current revision of CSA A23.1/CSA A23.2 “Concrete Materials and Methods of Concrete Construction/Test Methods and Standard Practices for Concrete” including full compliance with all informative annexes when specified in the contract documents for adherence.
Bidders must provide a sample supply of applicable equipment in operable condition with operation manual which will be returned upon completion of the tender process. Equipment will be evaluated for performance and security requirements (i.e., to ensure the cast-in-place device is non-transmitting), as outlined in Part B – Scope of Work.
All supply, material, equipment, and supervision required to complete the supply of Data Loggers, which includes, but is not limited to:
-
- Supply of equipment for thermal reporting of Cast-in-Place (CIP) Concrete.
- Devices must be supplied for operation in areas of Wi-Fi only and areas of cellular connectivity only.
- Cast-in-Place device must be operable for a minimum of 24 months.
- Cable length material must be readily available in lengths from 0.5 to 9 metres.
- All site materials are required to feature high-visibility exteriors. All devices must be purpose-made for construction conditions.
- All devices must be capable of operation in all weather and temperature conditions.
- All materials must be delivered within seven (7) business days of ordering. Quantities noted below may be scheduled over three to four (3-4) years of scheduled construction.
- Devices must be operable in uncontrolled environmental conditions, contain rechargeable batteries which operate a minimum of fourteen (14) days without a charge and be chargeable with 15-amp/125 volt or less receptable.
- Operation, viewing, and control system compatible with Apple iPhone (iOS), Microsoft EXCEL, and not require an access-controlled software. Operation systems/software to be included by Supplier. Capable of, but not limited to recording and plotting once per minute. With CM access-controlled records.
- Capable of, but not limited to transmitting data once every fifteen (15) minutes.
- CM access-controlled records.
- Cable lengths as noted in Part D – Tender Form, Appendix E – Unit Prices are +/- 100 millimeters.
- All equipment with wireless components must have FCC (or IC-ID) numbers. Bidders must provide a sample supply of applicable equipment in operable condition with operation manual which shall be returned upon completion of the tender process. Equipment will be evaluated for performance and security requirements (i.e., to ensure the cast-in-place device is non-transmitting).
- Bidders to include in Part D – Tender Form any required equipment, including either physical or operational items (i.e., software), which are required for system operation.
- Bidders to include in Part D – Tender Form any additional equipment which optimize or improve the installation, operation, and reporting of the cast-in-place temperature data logger system but are not required for functionality. These optional items are to be included in your Part D – Tender Form, Appendix B – Alternate Prices. Do not include any additions/deletions in your Subtotal Lump Sum Price.
- Bidder to submit a Bidder Question regarding any conflict or clarification required for 3.11 and 3.12.
- Bidder’s equipment that fails testing is subject to Part A – Instructions to Bidders, Item 6.8