This Project is required to interconnect a proposed copper mine in Northern Saskatchewan and includes approximately 78 km of new 138 kV transmission line construction (operated at 110 kV) from the existing IF56 line to the mine site.
The purpose of the Notice of Intended Procurement for IF56-FRN 138kV New Build Construction is to present an opportunity for prospective proponents to view the site conditions prior to snowfall and gain vendor insight on the project. The anticipated Right of Way will not have the vegetation cleared however another site visit will be available during the RFP posting period to view the Right of Way after the vegetation has been cleared. It is highly recommended that prospective proponents attend this site visit as the terrain may present certain characteristics that will influence the methodology to complete the work.
Site visit:
There will be an Optional Site Meeting at the junction of highway 106 and highway 135 on September 18, 2024 @ 9:00AM CST (time). It is expected that the site meeting will last most of the day.
Due to site conditions and restrictions, all representatives of a prospective proponent (including subcontractors) are to arrive at the site meeting in no more than one (1) vehicle. Confirmation of the number of attendees is required to be sent to the SaskPower Procurement Contact no later than August 30, 2024, 3:00 p.m. Central Standard Time. If confirmation of attendance is not received by the RFP Contact on or before this date and time, attendees may not be allowed on site.
PPE required including CSA approved hi-vis clothing, safety glasses, hard hat and safety footwear.
Confirmed attendees will be advised of any additional requirements they must comply with to access the site.