Tender available date: Friday, April 26, 2024.
Tender closing date: Tuesday, June 4, 2024.
Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail: Ikhtiyar.Mammadov@gov.ab.ca.
TENDERS will only be received by email at trans.tender@gov.ab.ca, before 2:01:00 P.M., for construction of the following work:
TND0023664
COLD MILLING, ASPHALT CONCRETE PAVEMENT (ACP) AND OTHER WORK
3:09 East of Hwy. 25 to Hwy. 4:07 / 43 Street
kilometre 1.120 to 8.120 (EBL)
3:09 East of Hwy. 25 to Hwy. 4:07 / 43 Street
kilometre 1.020 to 8.120 (WBL)
GRADING, GRANULAR BASE COURSE (GBC), COLD MILLING, ASPHALT CONCRETE PAVEMENT (ACP), PORTLAND CEMENT CONCRETE PAVEMENT, UPGRADE OF TRAFFIC SIGNALS, ELECTRICAL AND CONTROL SYSTEMS UPGRADES, STREET LIGHT INSTALLATION AND OTHER WORK
3:09 to 10 Intersection Improvement (INT. 4131) Jct. of Hwy. 3:09 & Hwy. 4:07
kilometre 8.120 to 8.745 (EBL)
kilometre 8.120 to 8.745 (WBL)
kilometre 0.000 to 0.110 (EBL)
kilometre 0.000 to 0.440 (WBL)
4:07 Intersection Improvement (INT. 4131) Jct. of Hwy. 3:09 & Hwy. 4:07
kilometre 4.840 to 5.210 (NBL)
kilometre 5.145 to 5.210 (SBL)
SOUTHERN REGION
APPROXIMATE QUANTITIES:
SCHEDULE A: HIGHWAY 3:09 EBL/WBL & WB STAFFORD DR. OFF-RAMP
1 Lump Sum Traffic Accommodation
2,225 Cubic Metre Subgrade Excavation
6,770 Square Metre Preparing Granular Surface
1,260 Tonne Granular Base Course Des. 2 Class 25
260 Metre Curb and Gutter (500mm Gutter)
3,640 Square Metre Topsoil - Supply and Place
233,920 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth
81,690 Square Metre Cold Milling Asphalt Pavement - 80 mm Depth
9,530 Square Metre Cold Milling Asphalt Pavement - 200 mm Depth
50,040 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5
(PG 70-28)
51,300 Tonne Supply of Aggregate - With Option
3,340 Metre Remove and Dispose of Existing Guardrail
1,940 Metre Remove, Salvage, and Reinstall Strong Post W-Beam Guardrail (Rail Only)
3,604 Metre Strong Post W-Beam Guardrail - Supply and Install
27 Unit Impact Attenuator (NCHRP 350/MASH 2009 TL-3) - Supply and
Install
14.23 Kilometre Durable Inlaid Roadway Lines - White Lane Dividing Lines (100 mm Thick)
7.72 Kilometre Durable Inlaid Roadway Lines - White Edge / Shoulder Lines (100 mm Thick)
7.93 Kilometre Durable Inlaid Roadway Lines - White Edge / Shoulder Lines (200 mm Thick)
45 Message Durable Inlaid Pavement Message - Stop Bar
23 Message Durable Inlaid Pavement Message – Crosswalk Line
29 Message Durable Inlaid Pavement Message - Gore Area
SCHEDULE B: INTERSECTION 4131 (HWY 3 & HWY 4/43 ST) IMPROVEMENTS
920 Square Metre Concrete Surface - Remove and Dispose
6,200 Cubic Metre Subgrade Excavation
10,660 Square Metre Preparing Granular Surface
11,420 Tonne Granular Base Course Des. 2 Class 25
960 Metre Curb and Gutter (500mm Gutter)
4,900 Square Metre Solid Concrete Medians
270 Square Metre Truck Apron (Portland Cement Concrete Pavement) - Supply and Place
15,050 Square Metre Cold Milling Asphalt Pavement - 200 mm Depth
10,030 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5
(PG 70-28)
2,270 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-20 (PG 70-28)
504 Square Metre Portland Cement Concrete Pavement - EPS
1 Lump Sum Temporary Traffic Signals
1 Lump Sum Traffic Signal System - Supply and Install
Contractor to supply all materials.
Contract Completion Date: October 15, 2024.