All Proponents are asked to review the complete RFP package of documents. To review the Complete RFP Package of Documents please refer to the following link:
https://www.niagaracollege.ca/purchasing/requests-for-tender/
The is planning for the construction of a new greenhouse.
The NextGen Greenhouse will be built in the same location of the existing Teaching Greenhouse (At the Daniel J Patterson Campus in Niagara-on-the-Lake), reusing as much of the existing concrete pad as possible, with a slight expansion to the South, as to not impede on the Niagara Escarpment views from Benchmark restaurant. The approximate size of the new greenhouse space will be 21,500sq.ft. (20,000sq.ft greenhouse and 1,500sq.ft corridor), replacing the existing 16,000sq.ft. greenhouse space. The existing Header House which includes the classroom and retail space, approximately 2,500sq.ft., will be retrofit and upgraded as part of this project as well. The new Greenhouse will be comprised of ten individual high-bay, Venlo design at 2,000sq.ft., five bays on either side of a connecting corridor. Each bay will be physically separated to ensure they are independently operable for heating and cooling, lighting, and irrigation to provide flexibility within the space.
A Non-Mandatory Proponents Meeting is scheduled, please see the details in the RFP package of documents.
All Proponents are asked to review the complete RFP package of documents. To review the Complete RFP Package of Documents please refer to the following link:
https://www.niagaracollege.ca/purchasing/requests-for-tender/