The R. M. of Oakview invites tenders for demolition of structure and clean up of the
property located at 190 6th Avenue, Rapid City, MB.
Sealed tenders clearly marked with
“DEMOLITION AND CLEAN UP”
will be received until Friday, June 4th, 2021 at 12:00 pm.
Companies submitting a Tender must be experienced and qualified in building
demolition, environmental controls and site clean up.
A penalty of $1,000.00 per day may be charged if projects are not completed by set date.
Scope and Schedule of Work
The buildings are to be demolished and removed/disposed of off site.
Work will include site cleanup and erosion stabilization of finished surface. Demolition
material is not to be used as fill. Material must be disposed of off site through a waste
collection company following environmental rules and regulations. Concrete that has
been properly separated from other waste material can be disposed of in the
appropriate location at the Rapid City Waste Disposal Site. Metal and scrap metal could
be salvaged but would be the responsibility of the contractor to arrange.
No further testing or environmental abatement has been undertaken at this site. The
contractor will be required to remove hazardous materials, if any, and dispose of them
in an environmentally acceptable manner. The contractor shall provide evidence of the
means of disposal prior to proceeding with demolition.
Information is summarized below for scope and known considerations.
Former Residential Site with Quonset and out buildings located at:
190 6th Ave, Rapid City, MB.
a. Buildings are to be demolished and disposed of off site, including contents.
b. Foundation(s) to be filled with clean common fill to match surrounding grades
with 6” of topsoil added to complete the filling of the excavation areas.
c. Electrical Service to be moved to a temporary mast. Contractor shall be responsible
to obtain required permits.
d. Coordinate utility relocation/protection as required.
e. Debris located throughout the property will need to be removed and disposed of.
f. Provide site security sufficient to prevent public entrance to site during demolition. At a
minimum the site shall have a temporary 6 ft high fence around the excavated areas
which shall be securely locked when contractor is not on site.
g. Protect existing trees where possible.
Additional details provided in attached documents.