D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of the decommissioning and removal of a wading pool and building, the supply and construction of a new “spray to drain” spray pad, and the associated site development.
D2.2 The major components of the Work are as follows:
(a) Removal of the east rink (boards, surround, paving), shed and associated foundations and granular base course;
(b) Removal and decommissioning of existing light standards and associated foundations (fixtures to be salvaged by the City);
(c) Removal and decommissioning of a wading pool;
(d) Design and construction of a straight-to-drain spray pad, including but not limited to all associated fixtures, drains, piping, electrical works and concrete spray basin, complete with all required permitting;
(e) Supply and installation of a concrete spray pad and associated walkways and sitting areas;
(f) Supply and Installation of water spray features;
(g) Sewer, water and electrical connections;
(h) Commissioning of the spray pad;
(i) Removal of an existing playground (equipment and safety surfacing);
(j) Supply and installation of playground equipment;
(k) Supply and installation of rubberized protective surfacing and engineered protective surfacing complete with concrete curb edging;
(l) Supply and installation of site furniture, signage, and receptacles;
(m) Supply and installation of chain link fencing;
(n) Supply and installation of a picnic shelter complete with helical piles, metal roof, and permitting;
(o) Supply and installation of planting and planting beds;
(p) Site restoration including site grading, topsoil, and sodding.
D2.3 The funds available for this Contract are 1,400,000.