D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of the supply and delivery of a CNC Plasma Cutting System in accordance with Detailed Specification 21603.
D2.2 Any material, labour or components not specifically mentioned or included herein, but may be required to complete, perfect and place the equipment in successful operation, shall be furnished by the Contractor as though specifically mentioned in these Contract Documents. The Contractor shall supply the equipment and all components and all features that are normally considered to be standard on that equipment, unless specifically excluded in the Form N: Detailed Specifications.
D2.3 Unless specifically stated otherwise in the Form N: Detailed Specifications, only new, unused equipment of current manufacture shall be accepted.
D2.4 Further to C7, if at any time during the 12 (twelve) month period following the award of the Contract, the City requires additional quantities of the Items, the City may request the Contractor to supply up to one hundred percent (100% ) additional quantities as extra Work at the unit prices set out in the Contract. The Contractor may decline to supply the additional quantities without penalty.
D2.5 Information regarding the details for the trade-in option may be found in Appendix A – Form M: Specification 21604 – Trade-In Option.