DEFENCE CONSTRUCTION CANADA (DCC) – HASBN42_CN64929 – Shingle Replacement, Metal/Brick Chimney Removals, and Fire Separations – Borden, Ontario
The work includes, but is not necessarily limited to, the supply of labour, material, supervision and equipment necessary to for the removal and replacement ofshingled roofs (25 units) including new attic baffles. Chimney removals including ninety (90) metal flue type chimney, brick roof chimney removals (87 units) and 217 fire separations.
The Plans and Specifications (P&S) for this opportunity may be ordered from MERX by logging on their website: www.merx.com or by calling 1 (800) 964-MERX (6379). The P&S are also available for viewing at the local Construction Association.
Amendments to the tender documents should be obtained from MERX AS AMENDMENTS OBTAINED FROM OTHER SOURCES MAY NOT BE THE LATEST.
Bids from bidders whose name does not appear on the official list of bidders who ordered the tender documents, may be declared invalid.
A site meeting has been arranged for the following date, time and location. It is highly recommended that bidders attend this site meeting.
Date: Thursday, 03 August, 2017
Time: 10:00 hours, local time
Location: DCC Office, 16 Ramillies Road, Building P-154, Borden
The estimated cost for this opportunity is in the range of $545,500.00
The Work must reach Substantial Completion no later than March 9, 2018 and that the Work must reach Completion no later than 28 calendar days after the date of Substantial Completion. Furthermore, the 25 units requiring roof replacement must be completed by November 17, 2017, and a minimum of an additional 173 units must be completed by December 17, 2017.
This procurement follows tendering procedures in accordance with Chapter 5 of the Agreement on Internal Trade.
Please note that the preliminary tender results for this project will be available on MERX.
Inquiries relating to this solicitation are to be directed ONLY to the DCC Contact provided above. Bidders who contact anyone other than the DCC Contact to obtain clarifications during the solicitation period may, for that reason alone, be disqualified.
The STANDARD CONSTRUCTION CONTRACT DOCUMENTS (DCL250), including the Instructions to Tenderers for Electronic Bidding (Form DCL 193E), form part of the Tender Package by reference. A hard copy of these documents can be ordered from MERX or downloaded from the DCC Website at http://www.dcc-cdc.gc.ca/documents/forms/DCL250_Standard_Construction_Contract_Documents.pdf
Bidders can obtain contract award results from the DCC Website at http://www.dcc-cdc.gc.ca/english/awarded/.